September 2017
CHS congratulates Marin Transit and Golden Gate Transit on the opening of the Novato Transit Center. The $4.7 million center, which had a ribbon cutting on September 6, features a 280-foot center platform with a Brazilian Walnut wood overhang. The design features a center platform in the median of Redwood Boulevard, which allows buses from opposite directions to crisscross one another to approach and depart. CHS designed a safe pedestrian crossing and signal priority system that allows buses to enter the traffic stream safely.